Available grid connection capacity in Poland
The first publicly available compilation of data from all six operators in one place. The available grid connection capacity of the operators: PSE, PGE Dystrybucja, TAURON Dystrybucja, Energa-Operator, Enea Operator and Stoen Operator, with an interactive map and voivodeship tables, is entirely online. Each operator provides its list with its own date; in this edition, these are days from 30 June 2026 to 1 October 2026.
As of 9 November 2026: 6,855.2 MW for new sources
The operators of five distribution networks report a total of 6,855.2 MW of available grid connection capacity for sources at 438 stations. For the PSE transmission network, the column intended for publication (step 2) is 0.0 MW.
| Operator | Capacity for sources | Stations | Data as of |
|---|---|---|---|
| Enea Operatoras of 9 November 2026 | 2,310.3 MW | 250 | 9 November 2026 |
| PGE Dystrybucjaas of 30 September 2026 | 1,785.0 MW | 47 | 30 September 2026 |
| TAURON Dystrybucjaas of 6 November 2026 | 1,180.0 MW | 75 | 6 November 2026 |
| Energa-Operatoras of 31 August 2026 | 1,145.0 MW | 48 | 31 August 2026 |
| Stoen Operatoras of 1 July 2026 | 434.9 MW | 18 | 1 July 2026 |
| PSEas of 31 October 2026 | 0.0 MW | 127 | 31 October 2026 |
| Voivodeship | Capacity for sources | Stations |
|---|---|---|
| Greater Poland | 1,699.6 MW | 99 |
| West Pomeranian | 690.0 MW | 61 |
| Łódź | 630.0 MW | 12 |
| Masovian | 624.9 MW | 30 |
| Silesian | 615.0 MW | 32 |
| Subcarpathian | 520.0 MW | 7 |
| Lublin | 410.0 MW | 9 |
| Kuyavian-Pomeranian | 281.2 MW | 41 |
| Lower Silesian | 245.0 MW | 22 |
| Lesser Poland | 220.0 MW | 13 |
| Lubusz | 205.9 MW | 51 |
| Pomeranian | 114.5 MW | 16 |
| Podlaskie | 110.0 MW | 5 |
| Warmian-Masurian | 80.0 MW | 11 |
| Opole | 70.0 MW | 8 |
| Świętokrzyskie | 45.0 MW | 6 |
| not assigned to a voivodeship | 294.0 MW | 15 |
Below is the full edition of the report from October 2026 (data up to 1 October 2026) with the values per station. Current values per station are on the TransakcjeOZE.pl map. Interactive map and tools
Where these figures come from
Source: lists of available grid connection capacity published by operators on the basis of Article 7 paragraph 8l of the Energy Law, collected by TransakcjeOZE.pl. Data as of, by operator: Enea Operator 9 November 2026, PGE Dystrybucja 30 September 2026, TAURON Dystrybucja 6 November 2026, Energa-Operator 31 August 2026, Stoen Operator 1 July 2026, PSE 31 October 2026. We calculate the totals from the values per station.
PSE: step 1: 300.0 MW; column intended for publication (step 2): 0.0 MW.
Where in Poland is there available grid connection capacity?
Network operators show a total of 4,501.0 MW of available grid connection capacity for sources in the distribution networks of five DSOs (values per GPZ station). For the PSE transmission network, the column indicated by PSE as intended for publication (step 2, taking into account connection conditions to the 110 kV network) amounts to 0.0 MW; the scenario omitting these conditions (step 1, according to the PSE document unlikely) is 300.0 MW. The data covers 597 stations and points at six operators. We assign stations to voivodeships only if their location is confirmed: among them, the largest available capacity for sources is in the Greater Poland voivodeship (713.1 MW), followed by the Masovian (554.9 MW) and Łódź (305.0 MW) voivodeships. For 2,113.0 MW in 241 stations, operator data allows only an approximate location, so we do not assign these capacities to voivodeships.
Power for sources (the ability to connect producers) and power for consumers (the ability to connect consumption) are different quantities, so we do not add them together. Lists of operators from 30.06 to 1 October 2026 (dates per operator in the table of operators below).
Map of available grid connection capacity for RES
The map shows values per station for PGE Dystrybucja, TAURON Dystrybucja, Energa-Operator and PSE: 317 stations and points for sources, totalling 1,775.0 MW. The map lacks 12 PSE points for which the list does not provide coordinates. Values per station for Enea Operator and Stoen Operator are presented only in voivodeship and operator aggregation, pending consent from these operators; full lists can be found on their websites and on the TransakcjeOZE.pl map. The marker colour shows the size of available capacity. PSE markers show 0.0 MW in accordance with the column indicated by PSE as intended for publication (step 2). Operator lists dated 30 June to 30 September 2026 (dates per operator in the operator table).
How much available grid connection capacity do the individual voivodeships have?
| Voivodeship | Stations | Total capacity for sources [MW] | Station with the highest power |
|---|---|---|---|
| (approximate location, unassigned) | 241 | 2,113.0 | ŻegrzeEnea Operator · 84.6 MW |
| Greater Poland | 17 | 713.1 | OstrówEnerga-Operator · 105.0 MW |
| Masovian | 41 | 554.9 | Mokotów (Sielce, Cybernetyki, Południowa, Służewiec, Stegny)Stoen Operator · 82.5 MW |
| Łódź | 19 | 305.0 | ŁęczycaEnerga-Operator · 110.0 MW |
| Lower Silesian | 21 | 250.0 | Kłodzko GroupTAURON Dystrybucja · 25.0 MW |
| Silesian | 32 | 110.0 | Grupa Komorowice 2TAURON Dystrybucja · 15.0 MW |
| Pomeranian | 10 | 100.0 | CzłuchówEnerga-Operator · 25.0 MW |
| Lesser Poland | 14 | 95.0 | Gorzków GroupTAURON Dystrybucja · 20.0 MW |
| Opole | 8 | 85.0 | Hermanowice GroupTAURON Dystrybucja · 15.0 MW |
| West Pomeranian | 7 | 60.1 | KoszalinEnerga-Operator · 20.0 MW |
| Warmian-Masurian | 11 | 60.0 | OlsztynEnerga-Operator · 25.0 MW |
| Kuyavian-Pomeranian | 6 | 30.0 | GrudziądzEnerga-Operator · 25.0 MW |
| Lublin | 10 | 10.0 | Bogdanka GroupPGE Dystrybucja · 5.0 MW |
| Subcarpathian | 13 | 5.0 | Latoszyn GroupTAURON Dystrybucja · 5.0 MW |
| Podlaskie | 7 | 5.0 | Wysokie Mazowieckie GroupPGE Dystrybucja · 5.0 MW |
| Świętokrzyskie | 13 | 5.0 | Opatów GroupPGE Dystrybucja · 5.0 MW |
| Lubusz | 0 | 0.0 | -no stations with confirmed location |
The table covers the distribution networks of five DSOs (values per GPZ station). We present PSE transmission network capacity separately, in the operators’ table. We assign stations to voivodeships only if their location is confirmed; stations for which the operator’s list allows only an approximate location (geocoding of the name) are shown in the row “approximate location, unassigned”. * The column shows the largest station in the given row (all operators, including Stoen and Enea in the unassigned pool). Voivodeship totals include the distribution networks of five DSOs; PSE capacity is not included because the column value provided by PSE for publication is 0.0 MW (see the operators’ table). Values for Enea Operator and Stoen Operator stations are presented in aggregate, pending their consent. Low values in eastern Poland primarily reflect PGE Dystrybucja’s cautious publication method (step values for groups of stations), rather than a measured lack of capacity in the network; compare voivodeships within the same operator. Some operator lists do not specify the voivodeship. We assign stations to voivodeships only if their location is confirmed (matching to the actual station or manual verification; point-in-polygon on voivodeship boundaries); stations with only an approximate location (geocoding of the station name) are shown in the row “approximate location, unassigned”.
How do individual operators publish data?
| Operator | Stations (generation sources) | Capacity for sources [MW] | Capacity for consumers [MW] | Date of the register | Source |
|---|---|---|---|---|---|
| Enea Operatordistribution network MV · aggregated presentation · daily update | 250 | 2,291.1 | 6,385.161 counties | 1 October 2026 | sources · recipients |
| Energa-Operatordistribution network | 48 | 1,145.0 | 1,260.048 stations | 31 August 2026 | operator’s list |
| TAURON Dystrybucjadistribution network | 75 | 545.0 | - | 1 July 2026 | operator’s list |
| Stoen Operatordistribution network 110 kV · presentation in aggregation | 18 | 434.9 | - | 1 July 2026list for the third quarter of 2026 | operator’s list |
| PGE Dystrybucjadistribution network | 79 | 85.0 | - | 30 June 2026 | operator’s list |
| PSEtransmission network 220/400 kV · column intended for publication (step 2) | 127 | 0.0 | - | 30 September 2026 | operator’s list |
PSE publishes data for the highest voltage transmission network (220/400 kV), other operators for their distribution networks: Enea publishes capacities for sources in the MV network (aggregation per GPZ substation), and capacity for consumers aggregated per county (hence 61 counties, not substations), Stoen for the 110 kV network, Energa, PGE and TAURON in accordance with the scope of their own publications. The PSE value is the column indicated in the PSE document as intended for publication (step 2, taking into account connection conditions issued for the 110 kV network); the scenario omitting these conditions (step 1, according to PSE unlikely) amounts to 300.0 MW. Enea updates its lists daily, so values on the operator’s website may differ from the status on the download date. A dash indicates that the operator does not publish the given quantity in the used list. Publication dates are provided according to the operators’ lists. Stoen Operator describes the list for the third quarter of 2026 on 1 July 2026.
Available grid connection capacity in the context of the application queue and refusals to issue connection conditions
The scale of the imbalance is clear: operators report over 4.5 GW of available grid connection capacity for sources connected to distribution networks, while the capacity of applications in the connection queue exceeds 213 GW. Therefore, for every 1 MW of available capacity reported, there are approximately 47 MW of capacity in the queue. The queue and the lists of available capacity come from separate publications by operators and do not balance out 1:1; the comparison shows the scale of pressure on the grid, not a simple balance.
Pressure is also evident in the refusals. According to the URE President’s Activity Report for 2025, operators issued 4,897 refusals to issue connection conditions for all types of sources, for a total capacity of 107,022.86 MW. The number of refusals fell year on year by approximately 37% (from 7,817 in 2024), but the total capacity covered by refusals increased by approximately 45% (from 73,586.12 MW in 2024).
Practical takeaway: available grid connection capacity is distributed unevenly. The largest reported reserves for energy sources are in the Greater Poland and Masovian voivodeships, while in parts of the country available values are close to zero. Publicly available data on these figures helps direct projects to areas where the grid still has capacity, before investors incur the costs of preparing a funding application.
Capacity today is not capacity tomorrow. Operators also publish forecasts for available capacity in the coming years. In many substations, values rise sharply following planned network investments; for example, the Gdańsk Błonia substation (Energa-Operator) increased from 20.0 MW in 2026 to 205.0 MW in 2035. You can find forecasts per substation on TransakcjeOZE.pl.
How to cite the report
Where do the data come from and how do we calculate them?
What does “available grid connection capacity” mean? It is the value published by the operator, representing the power capacity that, in their assessment, can still be connected to a specific power substation or group of substations. This value is reduced by the capacity resulting from issued and valid connection conditions. The value provided for a group of substations is the total limit for the entire group, not for each substation individually. This is not a commitment by the operator; the only binding confirmation of the possibility of connection is obtaining connection conditions from the relevant operator.
Legal basis for publication. Distribution system operators and the transmission system operator publish information on available grid connection capacity on the basis of Article 7 paragraph 8l of the Energy Law and update it at least once a quarter. The report aggregates these public lists into a single compilation. OK
Grid connection queue. Data on the capacity of applications in the queue comes from publications by operators based on Article 7 paragraph 8l point 1 of the Energy Law (consolidated text: Journal of Laws of 2026 item 43); 2,156 records. Publication dates: Stoen Operator 1 April 2026, Enea Operator, Energa-Operator, PGE Dystrybucja and PSE 30 June 2026, TAURON Dystrybucja 1 October 2026 (date of download; the operator does not provide the publication date). In total, the queues also include non-generation applications: energy storage (66.1 GW; approx. 31%), consumer connections (14.0 GW; approx. 6.5%) and connections of distribution systems by DSOs/SDs (23.2 GW; approx. 11%); this is not exclusively a queue for RES sources. The capacity of hybrid applications (e.g. PV installation with storage) is split equally between technologies to avoid double counting. SD entries in the PSE list may partially overlap with DSO queues; the lists are anonymised, so the scale of this overlap cannot be publicly verified. Applications with a total capacity of 6,382.1 MW (including 3,720.0 MW for a nuclear power plant connection) do not have an assigned location in the source publications, so they are not included in the voivodeship totals; they are included in the national total.
Methodological differences between operators. Each operator publishes the list in its own format: they differ in granularity (individual GPZ station, group of stations, area), publication format (table on the website, file, interactive report), scope (some operators publish only capacity for sources) and data status dates. We compile the values without conversions, so treat comparisons between operators as indicative. The locations of some stations are approximate (automated geocoding).
- Enea Operator · lists of available grid connection capacity published on the operator’s website, updated daily (Article 7 paragraph 8l of the Energy Law) · list as of 1 October 2026
https://www.operator.enea.pl/przylaczone-i-dostepne-moce-oze (sources)
https://www.operator.enea.pl/przylaczenie-do-sieci/dostepne-moce (consumers) - Energa-Operator · list of available grid connection capacities published on the operator’s website (Article 7, paragraph 8l of the Energy Law) · list as of 31 August 2026
https://energa-operator.pl/przylaczenie-do-sieci/informacje-o-stanie-przylaczen - PGE Dystrybucja · list of available grid connection capacities published on the operator’s website (Article 7 paragraph 8l of the Energy Law) · list as of 30 June 2026
https://pgedystrybucja.pl/przylaczenia/procedury-przylaczeniowe/dostepne-moce-dla-zrodel-wytworczych - PSE · list of available grid connection capacities published on the operator’s website (Article 7 paragraph 8l of the Energy Law) · list as of 30 September 2026
https://www.pse.pl/obszary-dzialalnosci/krajowy-system-elektroenergetyczny/informacja-o-dostepnosci-mocy-przylaczeniowej - Stoen Operator · list of available grid connection capacity published on the operator’s website (Article 7, paragraph 8l of the Energy Law) · list as of 1 July 2026 for the third quarter of 2026
https://www.stoen.pl/strona/siec - TAURON Dystrybucja · list of available grid connection capacity published on the operator’s website (Article 7 paragraph 8l of the Energy Law) · list as of 1 July 2026
https://www.tauron-dystrybucja.pl/przylaczenie-do-sieci/dostepne-moce/dla-wytworcow1
Most frequently asked questions about available grid connection capacity
Where in Poland are there the most available grid connection capacity?
According to operators’ publications (lists dated 30 June to 1 October 2026), the largest amount of available capacity for sources connected to the distribution networks of the five DSOs among stations with confirmed locations is in the Greater Poland voivodeship (713.1 MW), ahead of the Masovian (554.9 MW) and Łódź (305.0 MW) voivodeships. The next 2,113.0 MW is allocated to stations with only approximate locations, which we do not assign to any voivodeship. The full ranking of voivodeships along with the strongest stations is presented in the table above.
What does “available grid connection capacity” mean?
This is the power capacity that, according to the grid operator’s publication, can still be connected to a given substation or group of substations. It is reduced by the capacity from issued and valid connection conditions. This is indicative information; only obtaining connection conditions from the operator is binding.
How do the data of distribution system operators (DSOs) differ from those of PSE?
Five distribution system operators (PGE, TAURON, Energa, Enea, Stoen) publish the capacities for their distribution networks, to which most renewable energy projects are connected. PSE publishes the capacities for the highest voltage transmission networks of 220 and 400 kV, which are important for the largest installations. In the report, we present these values separately and do not sum them.
How often is the report updated?
We update the report quarterly, in line with the publication schedule of the programme operators. Programme operators are legally required to update the lists at least once per quarter (Article 7, paragraph 8l of the Energy Law). For each value, we provide the date of the data status and the source.
Why don’t we add the capacity for sources and for consumers to a single figure?
Capacity for sources describes the ability to connect producers (e.g. PV and wind farms), and capacity for consumers the ability to connect consumption (e.g. industrial plants). These are two different quantities and their sum has no technical sense, so we present them separately in the report.
Does available capacity include energy storage?
The lists of operators relate to generation sources. The treatment of energy storage and hybrid installations differs among operators, so the decisive factor is the grid connection conditions issued for a specific installation.
Why doesn’t the map show all stations one by one?
Two operators (Enea Operator and Stoen Operator) include in their service regulations a requirement for consent to further dissemination of materials. Until such consent is obtained, we present their data solely at the voivodeship and operator level; per-station values can be found in the lists on these operators’ websites and on the TransakcjeOZE.pl map.
Can I cite data from the report?
Yes. We make the report content available free of charge under the CC BY 4.0 licence, with the required source attribution in the format: Source: EFET Foundation / TransakcjeOZE.pl, Report “Available Grid Connection Capacity in Poland”, October 2026. The source data comes from publications by grid operators based on Article 7 paragraph 8l of the Energy Law.