Available grid connection capacity in Poland

The first publicly available compilation of data from all six operators in one place. The available grid connection capacity of the operators: PSE, PGE Dystrybucja, TAURON Dystrybucja, Energa-Operator, Enea Operator and Stoen Operator, with an interactive map and voivodeship tables, is entirely online. Each operator provides its list with its own date; in this edition, these are days from 30 June 2026 to 1 October 2026.

Free report Edition: October 2026 · quarterly update · next: January 2027
Interactive map and tools → TransakcjeOZE.pl
Data update

As of 9 November 2026: 6,855.2 MW for new sources

The operators of five distribution networks report a total of 6,855.2 MW of available grid connection capacity for sources at 438 stations. For the PSE transmission network, the column intended for publication (step 2) is 0.0 MW.

Network operators
OperatorCapacity for sourcesStationsData as of
Enea Operatoras of 9 November 20262,310.3 MW2509 November 2026
PGE Dystrybucjaas of 30 September 20261,785.0 MW4730 September 2026
TAURON Dystrybucjaas of 6 November 20261,180.0 MW756 November 2026
Energa-Operatoras of 31 August 20261,145.0 MW4831 August 2026
Stoen Operatoras of 1 July 2026434.9 MW181 July 2026
PSEas of 31 October 20260.0 MW12731 October 2026
Voivodeships
VoivodeshipCapacity for sourcesStations
Greater Poland1,699.6 MW99
West Pomeranian690.0 MW61
Łódź630.0 MW12
Masovian624.9 MW30
Silesian615.0 MW32
Subcarpathian520.0 MW7
Lublin410.0 MW9
Kuyavian-Pomeranian281.2 MW41
Lower Silesian245.0 MW22
Lesser Poland220.0 MW13
Lubusz205.9 MW51
Pomeranian114.5 MW16
Podlaskie110.0 MW5
Warmian-Masurian80.0 MW11
Opole70.0 MW8
Świętokrzyskie45.0 MW6
not assigned to a voivodeship294.0 MW15

Below is the full edition of the report from October 2026 (data up to 1 October 2026) with the values per station. Current values per station are on the TransakcjeOZE.pl map. Interactive map and tools

Where these figures come from

Source: lists of available grid connection capacity published by operators on the basis of Article 7 paragraph 8l of the Energy Law, collected by TransakcjeOZE.pl. Data as of, by operator: Enea Operator 9 November 2026, PGE Dystrybucja 30 September 2026, TAURON Dystrybucja 6 November 2026, Energa-Operator 31 August 2026, Stoen Operator 1 July 2026, PSE 31 October 2026. We calculate the totals from the values per station.

PSE: step 1: 300.0 MW; column intended for publication (step 2): 0.0 MW.

Key figures

Where in Poland is there available grid connection capacity?

Network operators show a total of 4,501.0 MW of available grid connection capacity for sources in the distribution networks of five DSOs (values per GPZ station). For the PSE transmission network, the column indicated by PSE as intended for publication (step 2, taking into account connection conditions to the 110 kV network) amounts to 0.0 MW; the scenario omitting these conditions (step 1, according to the PSE document unlikely) is 300.0 MW. The data covers 597 stations and points at six operators. We assign stations to voivodeships only if their location is confirmed: among them, the largest available capacity for sources is in the Greater Poland voivodeship (713.1 MW), followed by the Masovian (554.9 MW) and Łódź (305.0 MW) voivodeships. For 2,113.0 MW in 241 stations, operator data allows only an approximate location, so we do not assign these capacities to voivodeships.

Available capacity for sources
4,501.0MW
597 stations and points; distribution networks of five DSOs: 4,501.0 MW; PSE (column scheduled for publication, step 2): 0.0 MW
Capacity of applications in the queue
213,759.2MW
2,156 records from operators’ publications on the grid connection queue
Stations and points with data
706
including 109 capacity records for consumers: a total of 7,645.1 MW; 339 of 597 stations for sources show 0 MW
Operators
6
PSE + 5 DSOs, a complete set of large network operators
Rejections of connection in 2025 r.
4,897
total 107,022.86 MW from rejected applications (URE Report)

Power for sources (the ability to connect producers) and power for consumers (the ability to connect consumption) are different quantities, so we do not add them together. Lists of operators from 30.06 to 1 October 2026 (dates per operator in the table of operators below).

Map

Map of available grid connection capacity for RES

The map shows values per station for PGE Dystrybucja, TAURON Dystrybucja, Energa-Operator and PSE: 317 stations and points for sources, totalling 1,775.0 MW. The map lacks 12 PSE points for which the list does not provide coordinates. Values per station for Enea Operator and Stoen Operator are presented only in voivodeship and operator aggregation, pending consent from these operators; full lists can be found on their websites and on the TransakcjeOZE.pl map. The marker colour shows the size of available capacity. PSE markers show 0.0 MW in accordance with the column indicated by PSE as intended for publication (step 2). Operator lists dated 30 June to 30 September 2026 (dates per operator in the operator table).

Are you planning a project in a specific location? The free TransakcjeOZE.pl tool will show the nearest GPZ stations with available capacity, the queue of applications, and filters by operator and voltage. Check your location →
Ranking of voivodeships

How much available grid connection capacity do the individual voivodeships have?

Available capacity for sources in the distribution networks of five DSOs (values per GPZ station), by voivodeship, in descending order of total MW. Lists of operators for the period 30 June to 1 October 2026 (dates per operator in the operators table).
VoivodeshipStationsTotal capacity for sources [MW]Station with the highest power
(approximate location, unassigned)2412,113.0ŻegrzeEnea Operator · 84.6 MW
Greater Poland17713.1OstrówEnerga-Operator · 105.0 MW
Masovian41554.9Mokotów (Sielce, Cybernetyki, Południowa, Służewiec, Stegny)Stoen Operator · 82.5 MW
Łódź19305.0ŁęczycaEnerga-Operator · 110.0 MW
Lower Silesian21250.0Kłodzko GroupTAURON Dystrybucja · 25.0 MW
Silesian32110.0Grupa Komorowice 2TAURON Dystrybucja · 15.0 MW
Pomeranian10100.0CzłuchówEnerga-Operator · 25.0 MW
Lesser Poland1495.0Gorzków GroupTAURON Dystrybucja · 20.0 MW
Opole885.0Hermanowice GroupTAURON Dystrybucja · 15.0 MW
West Pomeranian760.1KoszalinEnerga-Operator · 20.0 MW
Warmian-Masurian1160.0OlsztynEnerga-Operator · 25.0 MW
Kuyavian-Pomeranian630.0GrudziądzEnerga-Operator · 25.0 MW
Lublin1010.0Bogdanka GroupPGE Dystrybucja · 5.0 MW
Subcarpathian135.0Latoszyn GroupTAURON Dystrybucja · 5.0 MW
Podlaskie75.0Wysokie Mazowieckie GroupPGE Dystrybucja · 5.0 MW
Świętokrzyskie135.0Opatów GroupPGE Dystrybucja · 5.0 MW
Lubusz00.0-no stations with confirmed location

The table covers the distribution networks of five DSOs (values per GPZ station). We present PSE transmission network capacity separately, in the operators’ table. We assign stations to voivodeships only if their location is confirmed; stations for which the operator’s list allows only an approximate location (geocoding of the name) are shown in the row “approximate location, unassigned”. * The column shows the largest station in the given row (all operators, including Stoen and Enea in the unassigned pool). Voivodeship totals include the distribution networks of five DSOs; PSE capacity is not included because the column value provided by PSE for publication is 0.0 MW (see the operators’ table). Values for Enea Operator and Stoen Operator stations are presented in aggregate, pending their consent. Low values in eastern Poland primarily reflect PGE Dystrybucja’s cautious publication method (step values for groups of stations), rather than a measured lack of capacity in the network; compare voivodeships within the same operator. Some operator lists do not specify the voivodeship. We assign stations to voivodeships only if their location is confirmed (matching to the actual station or manual verification; point-in-polygon on voivodeship boundaries); stations with only an approximate location (geocoding of the station name) are shown in the row “approximate location, unassigned”.

Operators

How do individual operators publish data?

Scope and dates of lists per operator. Capacity for sources and for consumers is compiled separately.
OperatorStations (generation sources)Capacity for sources [MW]Capacity for consumers [MW]Date of the registerSource
Enea Operatordistribution network MV · aggregated presentation · daily update2502,291.16,385.161 counties1 October 2026sources · recipients
Energa-Operatordistribution network481,145.01,260.048 stations31 August 2026operator’s list
TAURON Dystrybucjadistribution network75545.0-1 July 2026operator’s list
Stoen Operatordistribution network 110 kV · presentation in aggregation18434.9-1 July 2026list for the third quarter of 2026operator’s list
PGE Dystrybucjadistribution network7985.0-30 June 2026operator’s list
PSEtransmission network 220/400 kV · column intended for publication (step 2)1270.0-30 September 2026operator’s list

PSE publishes data for the highest voltage transmission network (220/400 kV), other operators for their distribution networks: Enea publishes capacities for sources in the MV network (aggregation per GPZ substation), and capacity for consumers aggregated per county (hence 61 counties, not substations), Stoen for the 110 kV network, Energa, PGE and TAURON in accordance with the scope of their own publications. The PSE value is the column indicated in the PSE document as intended for publication (step 2, taking into account connection conditions issued for the 110 kV network); the scenario omitting these conditions (step 1, according to PSE unlikely) amounts to 300.0 MW. Enea updates its lists daily, so values on the operator’s website may differ from the status on the download date. A dash indicates that the operator does not publish the given quantity in the used list. Publication dates are provided according to the operators’ lists. Stoen Operator describes the list for the third quarter of 2026 on 1 July 2026.

Context

Available grid connection capacity in the context of the application queue and refusals to issue connection conditions

213,759.2MW
capacity of applications in the connection queue (2,156 records from operators' publications)
4,897cases
refusals to issue connection conditions, all sources (2025, URE Report)
107,022.86MW
total capacity from rejected applications, all sources (2025, URE Report)

The scale of the imbalance is clear: operators report over 4.5 GW of available grid connection capacity for sources connected to distribution networks, while the capacity of applications in the connection queue exceeds 213 GW. Therefore, for every 1 MW of available capacity reported, there are approximately 47 MW of capacity in the queue. The queue and the lists of available capacity come from separate publications by operators and do not balance out 1:1; the comparison shows the scale of pressure on the grid, not a simple balance.

Pressure is also evident in the refusals. According to the URE President’s Activity Report for 2025, operators issued 4,897 refusals to issue connection conditions for all types of sources, for a total capacity of 107,022.86 MW. The number of refusals fell year on year by approximately 37% (from 7,817 in 2024), but the total capacity covered by refusals increased by approximately 45% (from 73,586.12 MW in 2024).

Practical takeaway: available grid connection capacity is distributed unevenly. The largest reported reserves for energy sources are in the Greater Poland and Masovian voivodeships, while in parts of the country available values are close to zero. Publicly available data on these figures helps direct projects to areas where the grid still has capacity, before investors incur the costs of preparing a funding application.

Capacity today is not capacity tomorrow. Operators also publish forecasts for available capacity in the coming years. In many substations, values rise sharply following planned network investments; for example, the Gdańsk Błonia substation (Energa-Operator) increased from 20.0 MW in 2026 to 205.0 MW in 2035. You can find forecasts per substation on TransakcjeOZE.pl.

Citation

How to cite the report

Citation format: Source: EFET Foundation / TransakcjeOZE.pl, Report “Available Grid Connection Capacity in Poland”, October 2026. The report is available online only and updated quarterly.
License: Report content: CC BY 4.0, source attribution required. Interactive map and tools: TransakcjeOZE.pl.
Methodology

Where do the data come from and how do we calculate them?

What does “available grid connection capacity” mean? It is the value published by the operator, representing the power capacity that, in their assessment, can still be connected to a specific power substation or group of substations. This value is reduced by the capacity resulting from issued and valid connection conditions. The value provided for a group of substations is the total limit for the entire group, not for each substation individually. This is not a commitment by the operator; the only binding confirmation of the possibility of connection is obtaining connection conditions from the relevant operator.

Legal basis for publication. Distribution system operators and the transmission system operator publish information on available grid connection capacity on the basis of Article 7 paragraph 8l of the Energy Law and update it at least once a quarter. The report aggregates these public lists into a single compilation. OK

Grid connection queue. Data on the capacity of applications in the queue comes from publications by operators based on Article 7 paragraph 8l point 1 of the Energy Law (consolidated text: Journal of Laws of 2026 item 43); 2,156 records. Publication dates: Stoen Operator 1 April 2026, Enea Operator, Energa-Operator, PGE Dystrybucja and PSE 30 June 2026, TAURON Dystrybucja 1 October 2026 (date of download; the operator does not provide the publication date). In total, the queues also include non-generation applications: energy storage (66.1 GW; approx. 31%), consumer connections (14.0 GW; approx. 6.5%) and connections of distribution systems by DSOs/SDs (23.2 GW; approx. 11%); this is not exclusively a queue for RES sources. The capacity of hybrid applications (e.g. PV installation with storage) is split equally between technologies to avoid double counting. SD entries in the PSE list may partially overlap with DSO queues; the lists are anonymised, so the scale of this overlap cannot be publicly verified. Applications with a total capacity of 6,382.1 MW (including 3,720.0 MW for a nuclear power plant connection) do not have an assigned location in the source publications, so they are not included in the voivodeship totals; they are included in the national total.

Methodological differences between operators. Each operator publishes the list in its own format: they differ in granularity (individual GPZ station, group of stations, area), publication format (table on the website, file, interactive report), scope (some operators publish only capacity for sources) and data status dates. We compile the values without conversions, so treat comparisons between operators as indicative. The locations of some stations are approximate (automated geocoding).

Disclaimer. Voivodeship boundaries: polska-geojson, © 2019 Piotr Patrzyk (MIT licence); source data for boundaries: GUGiK (PRG). Map base and data: © OpenStreetMap authors (ODbL licence). We use URE data in excerpts (aggregate figures from the URE President’s Report for 2025 r.), processed by the EFET Foundation; downloaded on 11 July 2026. Informational material. It does not replace an investigation of connection conditions or a legal analysis.
FAQ

Most frequently asked questions about available grid connection capacity

Where in Poland are there the most available grid connection capacity?

According to operators’ publications (lists dated 30 June to 1 October 2026), the largest amount of available capacity for sources connected to the distribution networks of the five DSOs among stations with confirmed locations is in the Greater Poland voivodeship (713.1 MW), ahead of the Masovian (554.9 MW) and Łódź (305.0 MW) voivodeships. The next 2,113.0 MW is allocated to stations with only approximate locations, which we do not assign to any voivodeship. The full ranking of voivodeships along with the strongest stations is presented in the table above.

What does “available grid connection capacity” mean?

This is the power capacity that, according to the grid operator’s publication, can still be connected to a given substation or group of substations. It is reduced by the capacity from issued and valid connection conditions. This is indicative information; only obtaining connection conditions from the operator is binding.

How do the data of distribution system operators (DSOs) differ from those of PSE?

Five distribution system operators (PGE, TAURON, Energa, Enea, Stoen) publish the capacities for their distribution networks, to which most renewable energy projects are connected. PSE publishes the capacities for the highest voltage transmission networks of 220 and 400 kV, which are important for the largest installations. In the report, we present these values separately and do not sum them.

How often is the report updated?

We update the report quarterly, in line with the publication schedule of the programme operators. Programme operators are legally required to update the lists at least once per quarter (Article 7, paragraph 8l of the Energy Law). For each value, we provide the date of the data status and the source.

Why don’t we add the capacity for sources and for consumers to a single figure?

Capacity for sources describes the ability to connect producers (e.g. PV and wind farms), and capacity for consumers the ability to connect consumption (e.g. industrial plants). These are two different quantities and their sum has no technical sense, so we present them separately in the report.

Does available capacity include energy storage?

The lists of operators relate to generation sources. The treatment of energy storage and hybrid installations differs among operators, so the decisive factor is the grid connection conditions issued for a specific installation.

Why doesn’t the map show all stations one by one?

Two operators (Enea Operator and Stoen Operator) include in their service regulations a requirement for consent to further dissemination of materials. Until such consent is obtained, we present their data solely at the voivodeship and operator level; per-station values can be found in the lists on these operators’ websites and on the TransakcjeOZE.pl map.

Can I cite data from the report?

Yes. We make the report content available free of charge under the CC BY 4.0 licence, with the required source attribution in the format: Source: EFET Foundation / TransakcjeOZE.pl, Report “Available Grid Connection Capacity in Poland”, October 2026. The source data comes from publications by grid operators based on Article 7 paragraph 8l of the Energy Law.

Do you have questions about the data from the report?

Contact us. We are happy to explain the methodology and discuss research or media collaboration.

Telephone+48 445 576 253
Addressul. Łucka 18 lok. 4/L, 00-845 Warszawa, Poland