The audit should help you determine the scope of your home's modernisation. Before ordering, agree the site visit, the information needed for the calculations, the full set of documents to be handed over and how the recommended option will be explained. The summary form alone does not replace the full audit.

In this guide

Set the goal and exact scope of the job

Say whether you are preparing a comprehensive renovation, heating replacement, insulation or a programme application. Ask whether the price covers all the necessary studies, the site visit and a discussion of the result. If you need an additional technical assessment or design, agree it separately. Do not assume that every service called an “audit” has the same scope.

Ask for a list of materials for the meeting. Building documentation, information on previous insulation and heating and energy consumption data may be useful. If you are missing some documents, say so before the visit. Do not fill gaps with random parameters found online.

What should the study explain?

  • Baseline: the data adopted on the building, its partitions and installations.
  • Works option: what changes are planned and why this scope was chosen.
  • Connections: how insulation, ventilation and heating affect the overall plan.
  • Assumptions: where the quantities, prices and conditions used in the calculations come from.
  • Documents: what you will receive, in what form and when.

Ask for an explanation of any tables you do not understand. The calculation result is not a promise about your bill: actual consumption also depends on the weather and how the building is used. Note down questions to clarify before you pass the scope to contractors.

The audit, DPAE and certificate serve different purposes

In the official Clean Air Programme explanations for the call from 31 March 2025, the official requirements specify an audit before the investment, the DPAE as an attachment to the application and a certificate after the project is completed. NFOŚiGW explains that the owner must hold the full audit, although the attachment to the application is the DPAE. The FAQ on the changes from 20 July 2026 confirms that the mandatory audit and certificate are retained. Check the documents applicable to the date your application is submitted.

The Audyt Bez Błędów guide highlights the site visit, the necessary inventory and the consistency of scope between the audit and the DPAE. On acceptance, compare the address, the description of the home and the planned works. Report any discrepancy you notice to the author for clarification before using the documents further.

How to use the result when talking to a contractor?

Prepare a concise scope sheet from the audit: element, area, required parameter and notes. Ask the contractor to refer to this sheet in the quote. If they propose a change, clarify it with the author of the study and the competent institution before approving it.

Keep the versions received and the correspondence about corrections. Mark the dates so that you do not accidentally compare an offer with an outdated option. Documentation prepared this way makes the conversation easier, without replacing an individual technical assessment or a decision on support.

Frequently asked questions

Is the DPAE alone enough?

No. NFOŚiGW requires a full audit. The DPAE is a separate summary for the application.

Is the audit a guarantee of savings?

No. The calculations are based on assumptions, and actual results also depend on how the works are carried out and how the house is used.

When should I clarify an error in the building description?

As soon as possible with the author of the report, before the document is used to order works or for further formalities.

Sources and currency

Sources reviewed: 17.10.2026. The organisational tips are EFET's suggestions. Check the support conditions and required documents for the relevant edition of the programme and your individual case.

Already have an audit and want to talk about the works?

In the first conversation, say that you have an audit and what scope you want to discuss. You do not need to attach documents to the enquiry.

Ask about carrying out the works All guides

You can also write to biuro@fundacjaefet.pl or call: +48 445 576 253.

Get support

    The controller of your personal data is Europejska Fundacja Energetycznej Transformacji (European Foundation for Energy Transformation), with its registered office in Warsaw (ul. Łucka 18 lok. 4/L, 00-845 Warszawa), entered in the register of entrepreneurs of the National Court Register kept by the District Court for the Capital City of Warsaw in Warsaw, XIII Commercial Division of the National Court Register, under KRS number 0001164353, NIP 5273158205, REGON 541288350. Providing personal data is voluntary, but it is necessary to handle your enquiry. The legal basis for processing the personal data provided is the consent you have given to the processing of your data. You have the right of access to your data, the right to rectification, the right to data portability, the right to restriction of processing and the right to erasure, as well as the right to lodge a complaint with the President of the Personal Data Protection Office (UODO). Detailed information on the processing of personal data is available in the Privacy Policy.