Documents and acceptance of modernisation: what to check before signing?
At acceptance, compare the completed works with the contract, cost estimate and technical documentation. Record any defects and how they will be remedied. Collect documents as you go, so that the final signature does not rest solely on a verbal assurance.
In this guide
Agree the acceptance rules before works begin
Ask what the contractor will hand over at the end of each stage. Describe the documents, the possibility of checking the works and the contact person. If you need technical support at acceptance, arrange it in advance. Not every aspect of workmanship can be assessed from a photo or a brief inspection.
Create a folder with the current contract, annexes, quote and changes. Give files dates and simple names. Confirm every agreement on changes to materials, scope or price in a way that can be traced later. Keep earlier versions so it is clear what was changed and when.
Collect documentation in four groups
- Scope: contract, specification, cost estimate, audit and agreed changes.
- Execution: photos of the stages, reports and results of measurements or checks appropriate to the type of works.
- Settlement: invoices, corrections and confirmations of actual payments.
- Use: manuals, product sheets, warranty terms and service details.
The exact set depends on the works and the funding requirements. The NFOŚiGW guide stresses the importance of keeping the contract, settlements, photos and correspondence. This list organises the documents but does not replace the requirements of a specific payment application.
What to record in the report?
State the actual stage, the inspection date and the scope of the works checked. Compare quantities and models with the contract. Note the documents received and those missing. If something is unfinished or raises doubts, describe it specifically: the element, the location, the problem observed and the agreed next step.
Agree who is responsible for the correction and the date it will be checked again. Do not confirm completion of all works if some are still outstanding. Make a legible copy of the signed document and keep it together with the relevant photos. If an entry has significant consequences for payments or claims, consider an individual consultation.
Keep acceptance of works separate from settlement of support
Signing the acceptance report does not mean the fund automatically accepts the expense. Check the programme requirements in the documents applicable to your case. NFOŚiGW also explains the obligation to hold and keep the full audit for the specified implementation and durability period of the project.
Finally, prepare a list of open matters: a document to be delivered, an invoice to be clarified, a correction, a service request. For each, note the contact and the deadline for the next step. That way you will not confuse finishing the works with completing all the formalities and settlements.
Frequently asked questions
Can I sign a blank acceptance report to be filled in later?
Do not do this. The document should describe the actual scope and the condition checked at the time of signing.
Do photos replace the contract and invoices?
No. They are different parts of the documentation. Photos help reconstruct the course of the works, while the other documents describe arrangements and settlements.
Is the EFET list the complete set of attachments for the fund?
No. It is an organisational aid. Determine the correct set based on the current programme documents and the type of works carried out.