How to compare home insulation offers? A list of questions
Two insulation offers can only be compared fairly when they cover the same surfaces, material parameters and works. Compare the gross price of the whole scope and the terms of execution, payment and acceptance.
In this guide
First, agree a common scope
Prepare one works sheet for all companies. State which building elements will be insulated, how areas are calculated and whether the quote should also cover reveals, the plinth and finishing. Note that the parameters resulting from the audit or design must be kept. Insulation thickness alone does not describe the whole solution.
If the contractor is to measure the house first, ask how the measurement is done. The number of metres in the cost estimate should be clear. If there are discrepancies, ask both firms to price an identical option before you assess the price difference.
Compare items, not just totals
| Area | Question for the contractor |
|---|---|
| Materials | What system, parameters, quantities and product documentation? |
| Works | Does the quote include substrate preparation and finishing? |
| Extras | Are scaffolding, transport, flashings and waste included in the price? |
| Settlement | What is the full gross amount and when are payments due? |
Ask for “included”, “not included” or “to be agreed” next to each unclear item. An empty field does not confirm that the work will be done. You will also find a list of questions on costs and organisation in the NFOŚiGW guide for residents.
Check the conditions that affect your choice
Record the planned start and end dates and how the windows, garden and access to the house will be protected. Agree who receives materials and who makes decisions during the works. Ask for a named contact person and a procedure for approving additional works.
Separately compare the terms of the warranty, defect reporting and documenting acceptance. Ask what must be ready before the final payment. Do not mark an offer as the best just because it has a shorter deadline or promises a high grant.
What the ZUM List does and does not give you
The ZUM List covers equipment and materials, not recommendations of contracting firms. If a listing is required for a given expense category, check the exact model and its current status. A product listing does not confirm the reliability of the installer or that support will be granted to a specific owner.
Finally, write down three unresolved questions for each offer. Send them in writing and keep the answers. Only a completed, common scope will let you move to a contract with the chosen company on an informed basis.
Frequently asked questions
Does the lowest price per metre mean the cheapest offer?
Not necessarily. Check the measurements, the full scope and any additional costs. The total for the whole job matters more than a single rate.
Is a company with a product on the ZUM list recommended by the fund?
No. The ZUM list is not a ranking of contractors and does not replace checking them.
What to do when the company changes the material?
Ask for a written description of the substitution, its effect on the price and confirmation that it complies with the agreed scope and technical requirements.
Sources and currency
Sources reviewed: 17.10.2026. The organisational tips are EFET's suggestions. Check the support conditions and required documents for the relevant edition of the programme and your individual case.

