How much grant for the replacement of a boiler in 2026?

In the Clean Air Programme, the grant for replacing an old boiler depends on the type of new heating, income and the condition of the house. For a pellet boiler with an enhanced standard, the limit is from PLN 8,200 to PLN 20,500, and for an air/water heat pump with an increased efficiency class, from PLN 14,080 to PLN 35,200.

How much grant goes towards new heating?

The table gives the maximum grants for applications submitted from 20 July 2026 onwards. Select the type of heating indicated in the audit and the column for your level of funding.

Type of costBasicIncreasedHighest
Connection to the district heating network together with the service connectionPLN 8,900PLN 15,575PLN 22,250
Air-to-water heat pump with a higher efficiency classPLN 14,080PLN 24,640PLN 35,200
Air-to-air heat pumpPLN 4,480PLN 7,840PLN 11,200
Ground-source heat pump with a higher efficiency classPLN 18,000PLN 31,500PLN 45,000
Ground source for a ground-source heat pumpPLN 8,000PLN 14,000PLN 20,000
High-standard wood gasification boilerPLN 8,200PLN 14,350PLN 20,500
Wood pellet boiler with an enhanced standardPLN 8,200PLN 14,350PLN 20,500
Electric heating other than a heat pumpPLN 4,480PLN 7,840PLN 11,200
Central heating and domestic hot water installationPLN 8,200PLN 14,350PLN 20,500
  • For a ground-source heat pump, the cost of constructing the lower source, for example boreholes, has a separate limit.

  • The replacement of the central heating or hot water system has a single, separate item in the cost estimate.

  • Ask the contractor to break down the price of the device, the installation and the works on the system. This will allow you to compare the offer with the relevant rows of the table.

Ask Ekoś

Most common question

Will I get the full limit from the table?

The fund takes documented net eligible costs into account. Where the relevant percentage of these costs gives an amount lower than the limit in the table, that amount sets the upper limit of the grant.

Source

Which level of grant corresponds to your income?

At the basic level, the annual income of the person submitting the application counts. At the other two levels, you check the average monthly income per person in the household.

LevelShare of net eligible costsMaximum income
Basicup to 40%PLN 135,000 per year per applicant
Increasedup to 70%PLN 2,250 per person or PLN 3,150 for a single person
Highestup to 100%PLN 1,300 per person or PLN 1,800 for a single person
  • If you are applying for the highest level of grant, the audit must show a demand for useful energy for heating above 140 kWh per square metre per year.

  • The right to a constant, periodic, family or special care allowance can replace the income criterion at the highest level.

  • Check the right to the allowance in each of the six calendar months before the month in which you apply for the certificate. It must last at least until the day the grant application is submitted.

  • At both higher levels, spouses without a separation ordered by a final judgment form a joint household within the meaning of the programme.

  • At both higher levels, the revenue from your business activity also counts. The fund examines the revenue from a spouse's business activity if separation has not been ordered by a final judgment.

  • At the highest grant level, you can present a certificate of entitlement to one of these allowances. Then the fund does not check the revenue limit.

  • Include VAT, costs above the limit and items outside the eligible scope in your own budget.

Source

Who can submit an application for boiler replacement?

The application is submitted by a natural person who is the owner or co-owner of a single-family house or of a separate dwelling within it with its own land and mortgage register.

How did you acquire your house or premises?Period of ownership
General ruleAt least 3 years
Inheritance or acquisitive prescriptionWithout a minimum period of ownership
Purchase of at least a 50% shareAt least a year
A gift or a life annuity agreement from an ascendant, for example a parent, covering at least 50% of the shareAt least a year
Merging premises in a single-family houseWithout a new period, if each of the flats was yours or shared for at least 3 years, and the building met the definition of a single-family house before the merger
  • With co-ownership, you need the consent of all the other co-owners. Before submitting the application, compare the date and method of acquisition with the conditions in the table.

  • If your premises were created as a result of dividing a house, the period of ownership of the premises counts from the entry in the land and mortgage register.

  • The house does not meet the conditions of the programme if an application for a building permit or design approval was submitted after 31 December 2020

  • The same deadline applies to the notification of construction or works when no permit was required.

  • List all the heat sources in the house. The replacement grant applies to houses where every heat source burns solid fuel and does not meet the requirements of class 5.

  • The devices being replaced must be permanently taken out of use. Keep the proof of their disposal, the invoices and the works acceptance report.

  • Compare the scope of the investment with the result of the audit. When the demand exceeds 140 kWh per square metre per year, replacing the boiler alone will not be enough.

  • In such a house, the programme also requires the indicator to be reduced by at least 40% and to reach at most 140 kWh per square metre per year after the works.

Ask Ekoś

Most common question

Can the boiler stay in the basement as a backup?

The boiler must be permanently taken out of use. Keep the personalised scrapping certificate, the waste transfer card or the metal waste acceptance form. If you cannot provide these documents, present another one that unequivocally confirms the decommissioning.

Source

Where do I submit an application?

The grant is awarded by the Voivodeship Fund for Environmental Protection and Water Management (WFOŚiGW) responsible for the location of the house.

  • Submit an application for prefinancing or for a grant at the highest level through the operator.

  • Municipalities and voivodeship funds act as operators. If there is no operator in your municipality, contact the WFOŚiGW.

  • Before you order the device, agree the scope of works with the auditor. Check whether the chosen pump or boiler model meets the conditions of the ZUM List.

Sources

By when do you need to install electric heating?

In the call from 20 July 2026, a special deadline applies to electric heating other than heat pumps. It covers, among other things, electric boilers and electric heating mats.

  • By 31 December 2026, submit an application covering this heating, buy the device and make sure it is installed in the house covered by the application.

  • The invoice or an equivalent document confirming purchase and installation must also be dated no later than that day. An advance invoice alone is not sufficient.

Questions and answers

Frequently Asked Questions

Will I get the full limit from the table?

The fund takes documented net eligible costs into account. Where the relevant percentage of these costs gives an amount lower than the limit in the table, that amount sets the upper limit of the grant.

Can the boiler stay in the basement as a backup?

The boiler must be permanently taken out of use. Keep the personalised scrapping certificate, the waste transfer card or the metal waste acceptance form. If you cannot provide these documents, present another one that unequivocally confirms the decommissioning.

Will the grant cover the purchase of a gas boiler?

In the cost table for the call from 20 July 2026 there is no gas boiler. If you are considering another appliance, first compare its type with the recommendations of the audit.

Is the application alone enough when purchasing electric heaters?

For an application under the July version of the programme, the purchase, the installation and the date of the document confirming them also count. You have time for all these activities until 31 December 2026

Order a home energy audit

Ask about the price of the audit and the scope of the auditor's work.

The EFET Foundation helps with making contact with the auditor.

Sources, related guides and disclaimers

The EFET Foundation is not the operator of the programme and does not process applications. We copied the amounts and deadlines from official sources, verified on 26 November 2026

Sources
Cooperation

EFET tools and guides are free and require no contact details: you do not pay us for them. Our work is funded through intermediation, that is, cooperation with contractors and municipalities. The terms of any cooperation and of carrying out works are agreed individually before they begin.

Notes

This guide is information, not an offer or a grant decision: we do not guarantee a grant.